Maersk’s Brazil news and advisory index listed an item dated 13 November 2026 titled “London Gateway Port and Port of Felixstowe: Suspension of Empty Container Acceptance.” The index is the primary evidence reviewed for this briefing. It establishes that Maersk published an advisory concerning empty-container acceptance at the two UK gateways, but the accessible index text did not provide the full advisory wording, start and end times, affected empty depots, booking conditions, or the cause of the suspension.

Accordingly, the suspension itself should be treated as a carrier-notified operational constraint, while its detailed scope remains unverified from the evidence available in this research. No independent terminal notice, port-authority notice, or separate carrier advisory was retrieved to corroborate whether acceptance was halted across all facilities or only for particular equipment flows.

London Gateway and Felixstowe are major UK container gateways. Where an empty-return suspension applies, exporters, forwarders, hauliers and equipment-control teams may be unable to return carrier-owned containers through their usual terminal channel during the affected period. This can create pressure on off-dock storage, alter trucking sequences and increase exposure to detention, storage or missed-cut-off disputes, depending on the applicable contract terms and the carrier’s specific instructions. Those effects are operational possibilities, not confirmed outcomes of this advisory.

For vessel operators and cargo interests, the immediate issue is not a navigation or port-clearance matter. It is equipment-flow control: whether an empty box can be returned, where it may be returned, and whether revised gate or depot instructions apply before export delivery plans are finalised. Masters and ship operators should not infer berth availability, cargo cut-off extensions or terminal acceptance of laden export containers from an empty-container advisory.

**Why this matters — analysis:** Short-notice restrictions on empty acceptance can rapidly shift congestion and cost exposure from the quay to depots, road haulage and customer premises. The practical risk is greatest for time-sensitive export cargo and for parties with limited storage flexibility. Stakeholders should obtain shipment-specific written confirmation from the contractual carrier or nominated depot, preserve time-stamped gate and communication records, and distinguish carrier instructions from terminal-wide operating status.

This is an editorial operational briefing only. It is not confirmation of terminal conditions, a gate instruction, a cargo-delivery authorisation or advice on contractual liability.

Assisted editorial process

Technology supported research and drafting. TWS retains editorial responsibility for the published content and cited sources.

Need operational support?

Turn intelligence into action.

Request attendance